Comprehensive SWMS for Installing Steel-Stud Track Partition Systems in Commercial Fit-Outs

Partitioning Steel-Stud-Track Safe Work Method Statement

2,000+ Australian Businesses Trust OneClickSWMS

No credit card required • Instant access • 100% compliant in every Australian state

5 sec
Creation Time
100%
Compliant
2,000+
Companies
$3.6K
Fines Avoided

Avoid WHS penalties up to $3.6M—issue compliant SWMS to every crew before work starts.

Steel-stud track partitioning involves the installation of lightweight steel framing systems to create internal walls and divisions within commercial and retail spaces. This essential shop fitting activity creates office layouts, retail zones, storage areas, and service spaces within bare shell tenancies or during fit-out renovations. The work requires precise measurement, structural understanding, coordination with building services, and management of hazards including manual handling of materials, power tool operation, work at heights, and dust generation from plasterboard installation. This SWMS addresses the specific safety requirements for steel-stud partitioning work in accordance with Australian WHS legislation, providing detailed hazard controls, inspection procedures, and step-by-step installation methods to ensure worker safety and compliance with Building Code requirements.

Unlimited drafts • Built-in WHS compliance • Works across every Australian state

Overview

What this SWMS covers

Steel-stud track partitioning is the primary method for creating internal divisions within commercial and retail premises during shop fitting and office fit-out work. This lightweight framing system uses cold-formed galvanised steel sections comprising floor tracks, ceiling tracks, and vertical studs to construct partition frames that are subsequently clad with plasterboard or other sheet materials. The system provides structural efficiency, fire resistance, acoustic performance, and flexibility for service integration while meeting Building Code of Australia requirements for commercial construction. The installation process begins with accurate setting out of partition locations according to architectural plans, marking floor and ceiling track positions that establish partition alignment and plumb. Floor tracks are fixed to concrete slabs or structural floors using powder-actuated fasteners or masonry anchors at specified centres, typically 600mm. Ceiling tracks fix to underside of structural slabs or roof framing, requiring overhead work and appropriate access equipment. Vertical studs cut to precise length are installed within the track system at 450mm or 600mm centres depending on structural and finish requirements. Door openings incorporate heavier gauge steel studs and head tracks to support door weights and traffic loads. Plasterboard installation to the completed steel frame constitutes a substantial component of partitioning work. Standard 10mm or 13mm plasterboard sheets measuring 2400mm x 1200mm weigh approximately 15-20kg and must be positioned, held, and secured to the steel frame using self-drilling drywall screws. Wall sheeting requires vertical positioning and support while fixing, with workers often using plasterboard lifters or team lifting to manage sheet weight and awkward handling. Fire-rated partitions require specific plasterboard types and installation methods to achieve required fire resistance levels, with inspections validating installation before concealment. Shop fitting partitioning work typically occurs in operational shopping centres and commercial buildings, creating unique safety considerations. Work often proceeds outside standard business hours to minimise disruption, introducing fatigue and reduced visibility hazards. Access constraints in retail environments limit equipment options and material storage. Coordination with multiple trades including electricians running cables through partition cavities, plumbers installing services, and ceiling contractors affects work sequencing. The work generates substantial dust from cutting steel sections and plasterboard, requiring effective suppression and extraction in enclosed retail spaces where air quality impacts neighbouring tenants.

Fully editable, audit-ready, and aligned to Australian WHS standards.

Why this SWMS matters

Steel-stud partitioning work presents significant manual handling risks that contribute to musculoskeletal disorders in the construction industry. Handling 6-metre steel studs and tracks weighing 8-12kg in confined retail spaces creates awkward posture and repetitive strain hazards. Plasterboard sheets weighing 15-20kg require overhead positioning during ceiling fixing and sustained holding during wall installation. Workers frequently adopt awkward bending, twisting, and overhead positions when fixing materials in confined spaces or at varying heights. The cumulative effect of repetitive lifting and positioning throughout extended shifts leads to shoulder injuries, lower back strain, and chronic pain conditions. Safe Work Australia data indicates manual handling incidents remain the leading cause of serious workers' compensation claims in construction, with partition installation work contributing substantially to these statistics. Powder-actuated fastening tools used to fix floor and ceiling tracks to concrete structures present serious injury risks if operated incorrectly. These tools use explosive charges to drive hardened steel pins through steel tracks into concrete at velocities exceeding 100 metres per second. Misfires, ricochet of pins from hard aggregates, and penetration through substrates into concealed services create severe hazard potential. Eye injuries from debris, hearing damage from repeated discharge noise, and penetration injuries from direct contact with discharge point all occur in partition installation work. Australian regulations classify powder-actuated tools as prescribed plant requiring operator training and competency verification before use. Equipment must be maintained according to manufacturer specifications with defective tools immediately removed from service. Respirable dust exposure during partitioning work creates serious long-term health risks. Cutting steel studs with abrasive saws generates metal particulates. Drilling into concrete floors and ceilings produces silica dust containing crystalline silica particles that cause silicosis, an incurable and potentially fatal lung disease. Plasterboard cutting, shaping, and sanding releases gypsum dust causing respiratory irritation and potential chronic effects with prolonged exposure. Shop fitting work in enclosed retail spaces with limited natural ventilation concentrates airborne dust to levels exceeding workplace exposure standards. Without effective dust suppression through water cutting methods, on-tool extraction, or respiratory protection, partition installers face cumulative exposure resulting in chronic respiratory conditions. Work at heights during ceiling track installation and plasterboard fixing to tall partitions introduces fall risks and struck-by hazards. Installing tracks to ceilings at 2700mm or higher requires stepladders, platform ladders, or mobile scaffolds. Installers working overhead frequently adopt unstable postures, overreach to avoid repositioning access equipment, or work with both hands occupied by materials and tools while maintaining balance. Falls from heights below 2 metres still cause serious injuries including head trauma, fractures, and spinal injuries. Overhead work also creates falling object hazards where dropped tools, fasteners, or materials strike workers below or members of the public in operational retail environments. Comprehensive SWMS implementation controls these exposures through access equipment selection, exclusion zone establishment, tool tethering, and strict work sequencing to separate incompatible activities in shared spaces.

Reinforce licensing, insurance, and regulator expectations for Partitioning Steel-Stud-Track Safe Work Method Statement crews before they mobilise.

Hazard identification

Surface the critical risks tied to this work scope and communicate them to every worker.

Risk register

Manual Handling of Steel Studs and Plasterboard Sheets

High

Partition installers frequently handle steel studs measuring up to 6 metres in length weighing 8-12kg, and plasterboard sheets measuring 2400mm x 1200mm weighing 15-20kg. Steel sections are typically delivered in bundles requiring manual separation and distribution to work locations. Plasterboard sheets must be lifted from floor level, positioned vertically or horizontally, and held in place during fixing. The awkward dimensions and weight create manual handling strain particularly when working in confined retail spaces with restricted positioning options. Repetitive handling throughout shifts compounds injury risk through cumulative loading of back, shoulder, and arm structures.

Consequence: Acute lower back strain, chronic lumbar disc degeneration, shoulder rotator cuff injuries, wrist strain, hernias, and long-term musculoskeletal disorders requiring extended time off work and potentially permanent restrictions on manual work capacity.

Powder-Actuated Tool Discharge Injuries and Ricochet

High

Fixing floor and ceiling tracks to concrete structures requires powder-actuated fastening tools that discharge hardened steel pins at high velocity using explosive cartridges. Pin ricochet occurs when fasteners strike hard aggregate within concrete or existing reinforcement bars, deflecting pins back toward the operator or nearby workers. Misfires can occur with worn tools or incorrect cartridge-to-substrate matching. Penetration through thin substrates or hollow structural elements risks striking concealed electrical cables, plumbing, or creating through-penetrations into occupied spaces below. Operator error including incorrect positioning, inadequate surface contact, or firing into unsuitable materials increases incident likelihood.

Consequence: Penetrating eye injuries potentially causing permanent vision loss, penetration wounds to hands or body from ricocheted pins, hearing damage from repeated discharge noise without adequate protection, and severe injuries to others if pins penetrate through substrates into occupied areas.

Respirable Silica and Gypsum Dust Exposure

High

Drilling into concrete floors and ceilings to install anchors generates crystalline silica dust, exposure to which causes silicosis, an incurable progressive lung disease. Cutting and shaping plasterboard using knives, saws, or sanders releases gypsum dust creating respiratory irritation. Abrasive cutting of steel sections produces metal dust particulates. Shop fitting work in enclosed retail premises with limited ventilation concentrates airborne dust to levels exceeding workplace exposure standards of 0.05 mg/m³ for respirable crystalline silica. Inadequate dust suppression or respiratory protection creates cumulative exposure risk over extended partition installation projects.

Consequence: Silicosis development from silica exposure requiring lung transplant in severe cases, chronic obstructive pulmonary disease (COPD), respiratory sensitisation, chronic bronchitis, and reduced lung function limiting work capacity and quality of life in severe exposures.

Falls from Stepladders During Ceiling Track Installation

Medium

Installing ceiling tracks at heights of 2700-3000mm typically requires stepladders or platform ladders for access. Workers must position overhead, hold steel tracks with one hand while operating powder-actuated tools or drills with the other hand, creating unstable postures and overbalancing risks. Frequent repositioning of access equipment is required along partition runs, with time pressure sometimes leading to overreaching rather than safe ladder repositioning. Cluttered work areas in active retail fit-outs, inadequate ladder setup on uneven surfaces, and fatigue during after-hours work compound fall risks.

Consequence: Head injuries from falls onto hard retail floors, wrist and arm fractures from impact arrest attempts, spinal compression injuries, shoulder dislocations, and soft tissue trauma. Falls from 2-3 metre heights frequently cause injuries requiring hospitalisation with extended recovery periods.

Cuts from Sharp Steel Section Edges and Plasterboard Knives

Medium

Cold-formed steel studs and tracks have sharp edges along their length, particularly after cutting operations. Handling steel sections during installation creates laceration risks to hands and forearms. Plasterboard cutting using utility knives with replaceable blades causes hand injuries when blades slip, when cutting toward body parts, or during blade changes. Trimming steel sections with snips or shears creates sharp offcuts and jagged edges. Rushed work in time-critical retail fit-outs increases likelihood of contact with sharp materials and tools.

Consequence: Deep lacerations requiring sutures, severed tendons in fingers or hands requiring surgical repair, puncture wounds from utility knife blades, infection from contaminated cuts in dusty work environments, and potential for permanent loss of hand function or dexterity from severe tendon or nerve damage.

Struck by Falling Materials from Height During Overhead Work

Medium

Installing ceiling tracks and upper sections of tall partitions creates overhead work environments where tools, fasteners, steel offcuts, and plasterboard sections can fall from working height. In operational retail environments, falling objects present risks not only to workers but to members of the public if work zone barriers are inadequate. Heavy tools such as powder-actuated fastening tools, cordless drills, or measuring equipment dropped from 2-3 metres generate substantial impact energy. Small items like screws and fasteners falling from height can cause eye injuries even if individually lightweight.

Consequence: Head injuries ranging from minor contusions to severe skull fractures and traumatic brain injury, eye injuries from small falling objects, shoulder and upper body impact injuries, and potential serious injury to public if objects penetrate work zone barriers.

Control measures

Deploy layered controls aligned to the hierarchy of hazard management.

Implementation guide

Mechanical Handling Aids for Steel and Plasterboard

Engineering Control

Provide mechanical handling equipment to eliminate or reduce manual lifting of steel sections and plasterboard. Plasterboard lifters or panel hoists support sheet material weight during positioning and fixing, particularly for ceiling application. Material trolleys transport bundles of steel sections from storage to installation locations. Trestles or racks at appropriate working height reduce bending during cutting and preparation. For tall partition work, consider mobile scaffold platforms providing working height access that eliminates reaching overhead while fixing upper sections.

Implementation

1. Provide plasterboard lifters (mechanical or hydraulic) capable of supporting 2400mm sheets at heights up to 3000mm for ceiling installation 2. Use material trolleys with appropriate wheel sizes for retail floor surfaces to transport steel bundles 3. Position cutting stations using trestles at 800-900mm height to minimise bending during steel section preparation 4. Implement two-person lifting protocols for all plasterboard sheets during wall installation - one person positions while second fixes 5. For partition runs exceeding 6 metres, use mobile scaffold platforms rather than stepladders to eliminate repeated repositioning and overhead reaching 6. Store materials at working height using racks or pallets - avoid floor-level storage requiring repeated bending to retrieve materials

Powder-Actuated Tool Safety Protocol and Operator Training

Administrative Control

Restrict powder-actuated tool operation to trained and assessed competent operators. Implement mandatory pre-use inspection verifying tool serviceability and appropriate cartridge selection. Establish exclusion zones during fastening operations preventing exposure of other workers or public. Require substrate testing before firing to verify suitability and detect concealed services. Maintain comprehensive records of tool maintenance, inspection, and operator training verification.

Implementation

1. Verify all operators hold current powder-actuated tool competency certification before permitting equipment use 2. Complete pre-start inspection checklist covering barrel condition, trigger mechanism, safety features, and cleaning status 3. Select appropriate cartridge strength for substrate hardness - test fire on sample to verify penetration without complete punch-through 4. Use cable detection equipment to scan for concealed services before firing into floors or ceilings near known service routes 5. Establish 5-metre exclusion zone around operator during fastening operations with physical barriers or flagging in public areas 6. Ensure hearing protection is worn by operator and nearby workers within 10 metres of discharge location 7. Remove defective tools from service immediately with clear 'DO NOT USE' tagging and arrange manufacturer service before return to use

Dust Suppression Through Water Cutting and On-Tool Extraction

Engineering Control

Eliminate or minimise airborne dust generation through water suppression during concrete drilling, on-tool dust extraction during plasterboard cutting, and wet cleaning methods instead of dry sweeping. Water-fed core drills suppress silica dust at source during ceiling and floor penetrations. Plasterboard cutting tools with integrated dust extraction capture gypsum dust before it becomes airborne. Wet wiping and HEPA-filtered vacuum cleaning prevent dust redistribution during cleanup.

Implementation

1. Use water-fed core drilling equipment for all concrete penetrations - maintain adequate water supply and drainage collection 2. Connect plasterboard cutting tools and sanders to HEPA-filtered vacuum extractors rated for fine dust capture 3. Minimise dry cutting of plasterboard by scoring and snapping where practical rather than power sawing 4. Wet mop floors and wet wipe surfaces during progressive cleanup rather than dry sweeping which disperses dust 5. Use HEPA-filtered vacuum cleaners rated for construction dust when dry cleaning is necessary 6. Schedule high dust-generation activities during times when adjacent retail tenancies are closed to minimise exposure to others 7. Monitor visible dust accumulation and increase suppression or extraction measures if control appears inadequate

Platform Ladders and Mobile Scaffolds for Ceiling Work

Substitution

Substitute conventional stepladders with platform ladders providing larger standing surface and handrail support, or use mobile scaffold platforms for extended ceiling track installation. Platform ladders allow safer overhead work positioning while mobile scaffolds eliminate repeated ladder repositioning and provide continuous access along partition runs. Both options improve stability and reduce overreaching compared to stepladder use.

Implementation

1. Provide platform ladders with minimum 450mm x 450mm standing surface and handrails extending above platform for ceiling track installation 2. Select mobile scaffold platforms rated to appropriate load capacity (minimum 225kg) for extended ceiling work and plasterboard fixing to tall partitions 3. Ensure mobile scaffold platforms have lockable wheels preventing movement during work and adequate platform width for material staging 4. Position access equipment to allow worker to face work directly without twisting - relocate rather than overreaching 5. Maintain three points of contact when ascending or descending platform ladders or scaffold access 6. On larger partition projects, consider installing working platforms spanning entire partition length for continuous safe access during ceiling track and upper plasterboard installation

Exclusion Zones and Overhead Work Barriers in Public Areas

Administrative Control

Establish physical exclusion zones preventing public or worker access beneath overhead work areas during ceiling installation and tall partition plasterboard fixing. Barriers must completely prevent entry rather than relying on signage alone. Overhead protection using scaffold decking or similar solid barriers may be required where public access cannot be diverted. Schedule high-risk overhead work during minimal public access periods where possible.

Implementation

1. Install temporary fencing or solid hoarding at minimum 3 metres from base of overhead work position in all directions 2. Position barriers before commencing overhead work - never permit unprotected overhead work in public areas 3. Erect signage on barriers indicating construction zone with entry prohibited to unauthorised persons 4. In shopping centres where public diversion is not possible, install overhead protection using scaffold and solid decking above public pathways 5. Coordinate work scheduling with centre management to perform high-risk overhead installation during closed hours where practical 6. Assign spotter to monitor barrier integrity and prevent unauthorised entry attempts when working in high-traffic locations 7. Maintain exclusion zones until overhead work is complete and all materials are secured or removed from height

PPE for Partitioning Installation Activities

Personal Protective Equipment

Provide and mandate task-specific PPE including cut-resistant gloves for handling steel sections, safety glasses with side protection for all work activities, hearing protection during powder-actuated tool use, respiratory protection when dust suppression is insufficient, and steel cap boots throughout all partition work. PPE selection must match specific task hazards with regular inspection ensuring serviceability.

Implementation

1. Issue cut-resistant gloves rated Level 3 (AS/NZS 2161.4) for handling steel studs and tracks - select gloves with adequate dexterity for fastener handling 2. Require safety glasses with side shields (AS/NZS 1337) for all workers in partition installation area - prescription glasses require over-specs 3. Mandate Class 4 hearing protection (AS/NZS 1270) for powder-actuated tool operators and all workers within 10 metres during discharge 4. Provide P2 respirators (AS/NZS 1716) for concrete drilling operations and any work where dust suppression cannot adequately control exposures 5. Ensure all workers wear steel cap safety boots (AS/NZS 2210.3) protecting against dropped materials and penetration from steel offcuts 6. Inspect PPE daily for damage or wear - replace damaged items immediately and maintain adequate spare stock on site 7. Provide PPE storage allowing clean, dry storage overnight - do not leave respirators in dusty environments degrading filter performance

Personal protective equipment

Requirement: Level 3 cut resistance per AS/NZS 2161.4

When: When handling steel studs and tracks, cutting steel sections, or handling materials with sharp edges during all partition framing work

Requirement: Medium impact rated per AS/NZS 1337

When: Throughout all partitioning work including steel cutting, powder-actuated fastening, drilling, and plasterboard installation activities

Requirement: Class 4 protection per AS/NZS 1270 for operators, Class 3 for nearby workers

When: When operating or working within 10 metres of powder-actuated tools, abrasive cutters, or other high-noise equipment

Requirement: P2 particulate filter per AS/NZS 1716

When: During concrete drilling operations, when cutting plasterboard in confined areas, or whenever dust suppression measures cannot adequately control airborne dust

Requirement: Category 1 impact protection per AS/NZS 2210.3

When: Throughout all partition installation activities to protect against dropped steel bundles, plasterboard sheets, and tools

Requirement: Class D day/night visibility per AS/NZS 4602.1

When: When working in operational retail environments, shopping centres, or any location with vehicle movement or public access

Inspections & checks

Before work starts

  • Verify partition setting-out marks are accurately positioned and approved before commencing track installation
  • Confirm floor and ceiling surfaces are suitable for fixing - identify any areas requiring specialised anchors or structural assessment
  • Scan floor and ceiling locations for concealed services using cable detection equipment along entire partition run
  • Inspect powder-actuated tools for serviceability including barrel condition, trigger mechanism, safety features, and recent service date
  • Check availability and serviceability of access equipment including platform ladders or mobile scaffolds required for ceiling work
  • Verify dust suppression equipment is operational including water supply for drilling and vacuum extractors for plasterboard work
  • Confirm exclusion zone barriers are positioned if working in public areas or above occupied spaces
  • Inspect all PPE including cut-resistant gloves, safety glasses, hearing protection, and respirators for serviceability and correct fit

During work

  • Monitor manual handling techniques during steel and plasterboard handling - intervene if unsafe lifting or awkward postures observed
  • Verify powder-actuated tool operators establish exclusion zones and perform substrate testing before each fastening operation
  • Check dust suppression measures are operating effectively - increase controls if visible dust accumulation or airborne dust observed
  • Inspect access equipment positioning before use - verify stable setup without overreaching required to complete work
  • Monitor overhead work areas to ensure exclusion zones remain established and members of public do not enter hazard zones
  • Verify workers are wearing appropriate PPE for current task including hearing protection during powder-actuated tool use
  • Check plasterboard fixing spacing and pattern meets specification - inadequate fixing creates structural and safety deficiencies
  • Monitor worker fatigue during extended installation work particularly during after-hours shifts - enforce rest breaks as needed

After work

  • Inspect completed partition framing for structural adequacy before plasterboard installation - verify stud spacing and bracing
  • Check all penetrations through fire-rated partitions are appropriately sealed maintaining required fire resistance levels
  • Clean work area removing all steel offcuts, plasterboard waste, fasteners, and debris from completed partition installation
  • Vacuum or wet-clean accumulated dust from floors and surfaces - do not dry sweep which disperses dust into air
  • Inspect and clean powder-actuated tools according to manufacturer requirements before storage - maintain service records
  • Complete tool inspection noting any damage or defects requiring maintenance before next use
  • Document any installation variations from plans including additional bracing, modified opening locations, or structural modifications
  • Report any near-misses, safety concerns, or incidents in daily log including details and corrective actions taken

Step-by-step work procedure

Give supervisors and crews a clear, auditable sequence for the task.

Field ready

Setting Out and Mark-Up of Partition Locations

Transfer partition locations from architectural plans to floor and ceiling surfaces using precise measurement and alignment techniques. Establish datum lines using laser levels or string lines to ensure partition runs are straight and correctly positioned. Mark floor track positions using chalk lines or marking paint that will remain visible during installation. Identify door opening locations and widths, marking jamb positions accurately. Transfer floor marks to ceiling using plumb bob or laser plummet, marking ceiling track locations that align directly above floor tracks. Verify partition locations do not conflict with building services, structural elements, or access requirements. Measure and verify all dimensions match approved plans before proceeding to material cutting and installation. In operational retail areas, protect finished floor surfaces with temporary covering during marking operations.

Safety considerations

Ensure adequate lighting for accurate measurement and marking. Use laser safety glasses when operating laser levels. Verify floor and ceiling areas are clear of trip hazards before establishing lines. When working on ladders for ceiling marking, ensure stable ladder positioning and maintain three points of contact. Coordinate with building management to verify all services are accurately located before marking penetration points.

Floor and Ceiling Track Installation

Cut floor and ceiling tracks to required lengths using tin snips, circular saw with metal-cutting blade, or dedicated steel section cutter. Wear cut-resistant gloves when handling cut sections with sharp edges. Position floor tracks precisely on marked lines ensuring track flanges face inward along partition run. Fix floor tracks to concrete substrate using powder-actuated fastening or masonry anchors at maximum 600mm centres and within 50mm of track ends. Operators of powder-actuated tools must hold current competency certification and complete pre-use inspection. Establish exclusion zones during fastening operations. Install ceiling tracks using platform ladder or mobile scaffold for access. Position ceiling tracks directly above floor tracks verifying alignment using plumb bob or laser plummet. Fix ceiling tracks to structural ceiling using appropriate fasteners - concrete ceilings require anchors while steel decks use self-drilling screws. For suspended ceiling systems, install additional bracing from structural ceiling above. Verify track installation is level and secure before proceeding to stud installation.

Safety considerations

Operators using powder-actuated tools must establish 5-metre exclusion zones and wear hearing and eye protection. Scan substrates for concealed services before firing fasteners. When installing ceiling tracks from height, ensure stable access equipment setup and avoid overreaching. Never hold powder-actuated tool against body parts. Use two-person teams for ceiling track installation - one worker supports track while second secures fixings. Maintain adequate ventilation if using compressed air tools.

Vertical Stud Measurement, Cutting and Installation

Measure precise height from floor track to ceiling track at multiple points along partition run. Account for any floor or ceiling irregularities that may affect stud lengths. Cut steel studs 10-15mm shorter than measured height to allow easy positioning within tracks. Use appropriate cutting tools including tin snips for small quantities or circular saw with metal blade for production cutting. Deburr cut ends removing sharp edges before handling. Position studs vertically within floor and ceiling tracks at specified centres - typically 450mm or 600mm depending on partition height and loading requirements. Install studs with flanges oriented to support plasterboard on both sides. Connect studs to tracks using appropriate fasteners - clinching tools, self-drilling screws, or crimp tools depending on system specification. Install additional studs either side of door openings and at partition intersections. Install horizontal noggings at mid-height for partitions exceeding 2700mm height to prevent stud buckling and provide additional fixing for plasterboard joints. Verify stud spacing is consistent and all studs are vertical before plasterboard installation.

Safety considerations

Use two-person handling for steel studs exceeding 3 metres length to prevent manual handling strain and loss of control. Wear cut-resistant gloves when handling freshly cut steel sections. Ensure cutting area is clear of other workers when operating power saws. Use hearing protection during extended cutting operations. Position cutting station at comfortable working height using trestles to minimise bending. Store cut studs in organised bundles to prevent trip hazards and facilitate easy retrieval during installation.

Service Penetrations and Door Frame Installation

Coordinate with electrical and mechanical services contractors to establish required penetrations through partition framing for cables, pipes, and ductwork. Install rubber grommets or protective bushings at all penetrations preventing cable damage from sharp steel edges. For fire-rated partitions, ensure penetrations are sleeved and will be appropriately sealed maintaining fire resistance. Install door frames according to manufacturer specifications. Use heavier gauge steel studs either side of door openings to support door weight and traffic loads. Install head track above door opening using doubled sections for wide openings exceeding 900mm. Ensure door frame is plumb, level, and square before fixing. Verify door frame width matches door size plus required clearances. Brace door frames temporarily to prevent movement during subsequent plasterboard installation. Install acoustic seals and fire seals as required for door type and partition specification. For glazed portions of partitions, install additional framing to support glass panel weight and provide fixing for glazing beads.

Safety considerations

Coordinate service installation timing to avoid conflicts between trades working in same partition cavity. Ensure power to electrical cables is isolated before installing penetrations near cable routes. Heavy door frames may require two-person lifting and positioning. Verify adequate bracing is installed before releasing door frame - unstable frames can topple causing injury. Use cable detection equipment to verify concealed services before drilling fixing holes for frames.

First Side Plasterboard Installation to Steel Frame

Install plasterboard sheets to one side of completed steel frame starting from ceiling and working downward, or from one end of partition working along length. Use plasterboard screws at 200mm centres to perimeter and 300mm centres to intermediate studs. Position sheets vertically for wall applications with joints occurring on stud centres. Stagger joints vertically preventing continuous joints that weaken partition. Cut plasterboard to size using utility knife and straight edge - score face deeply then snap along score line. Use keyhole saw or plasterboard saw for door openings and service penetrations. For ceiling applications, use plasterboard lifter or two-person installation to support sheet weight during fixing. Drive screws to slight dimple in plasterboard surface without breaking paper face. Maintain 10mm gap at floor level for acoustic isolation and 5mm gaps at ceiling for building movement. For fire-rated partitions, ensure plasterboard joints do not align on both sides - offset joints by minimum 600mm. Install fire-rated plasterboard where specified, ensuring correct type and thickness for required fire resistance level. Inspect first side installation before proceeding to services and insulation installation.

Safety considerations

Use two-person teams for all plasterboard sheet handling - one person positions while second fixes. Plasterboard lifters eliminate overhead holding during ceiling installation reducing shoulder strain. Ensure stable footing when working from access equipment - reposition rather than overreaching. Wear safety glasses when screwing overhead as plasterboard debris falls during fixing. Use sharp utility knife blades to minimise force required during cutting - replace blunt blades immediately. Control plasterboard dust during cutting by scoring rather than sawing where possible. Cut away from body and keep free hand clear of cutting line.

Insulation and Services Installation in Partition Cavity

Install acoustic or thermal insulation batts within partition cavity as specified. Friction-fit insulation between studs ensuring complete fill without compression which reduces performance. Cut insulation to fit around electrical boxes, cables, and penetrations. For fire-rated partitions, use fire-rated insulation products maintaining required fire resistance. Coordinate with electrical contractors for installation of cables, outlet boxes, and switches within partition cavity. Ensure electrical cables are adequately supported and do not contact sharp steel edges - use grommets or protective sleeving at all penetrations. Install backing plates behind positions where fixtures will be mounted to finished partition providing adequate fixing substrate. Verify all services are installed and inspected before closing partition with second side plasterboard. Photograph cavity showing services and insulation installation as quality record before concealment. For acoustic partitions, seal all gaps and penetrations with acoustic sealant preventing sound flanking paths.

Safety considerations

Wear gloves and long sleeves when handling fibrous insulation to prevent skin irritation. Use dust mask or respirator if insulation generates airborne fibres during cutting and installation. Ensure electrical work is performed by licensed electricians only - shop fitters must not make electrical connections. Verify electrical isolation before installing insulation around cables and outlets. Avoid compressing insulation which reduces effectiveness and may violate fire rating requirements. Maintain good housekeeping removing insulation offcuts and packaging as work proceeds.

Second Side Plasterboard Installation and Finishing Preparation

Install plasterboard to second side of partition using same techniques as first side. Offset vertical joints from first side by minimum 600mm to improve structural performance and fire rating. Ensure screws penetrate minimum 10mm into steel studs for adequate fixing. Install additional sheets around door frames ensuring neat tight fit to frame edges. Cut openings for electrical outlets and switches using keyhole saw or plasterboard cutting tool, measuring carefully from installed outlet boxes. Verify all fixings are adequately tightened and plasterboard is firmly secured to framing. Check partition alignment using straight edge identifying any bowing or irregularities requiring correction before finishing. Install corner beads to external corners using crimping tool or screws, ensuring beads are straight and plumb. Install shadow line or top-of-wall expansion joints as detailed preventing cracking from building movement. Complete visual inspection of installation checking screw depth, joint alignment, corner bead positioning, and overall plasterboard installation quality before handover to finishing trades. Remove all debris, offcuts, and packaging from work area. Coordinate with plasterers regarding timing for jointing and finishing work.

Safety considerations

Maintain same manual handling and access equipment protocols as first side installation. Ensure electrical outlet boxes are correctly positioned before cutting openings - incorrect cutting requires additional patching work. Verify all services in partition cavity are complete before closing second side as accessing cavity after installation requires destructive plasterboard removal. Clean work area progressively removing trip hazards and accumulated waste. Use wet cleaning methods or vacuum for dust control - dry sweeping disperses dust into breathing zone. Ensure adequate ventilation before leaving enclosed spaces to allow any dust to settle or disperse.

Final Inspection and Documentation

Conduct comprehensive inspection of completed partition installation verifying compliance with specifications and building code requirements. Check partition alignment and plumb using spirit level and straight edge. Verify door openings are correct size and square. Inspect plasterboard fixing ensuring adequate screw spacing and no proud fasteners that will interfere with finishing. For fire-rated partitions, verify all penetrations are appropriately sleeved and ready for fire-rated sealing. Check that required gaps at floor and ceiling are maintained for acoustic and movement purposes. Document installation including photographs showing completed framing, services installation, insulation, and both sides of plasterboard before finishing. Record any variations from approved plans including modified opening locations, additional bracing, or structural modifications. Measure and document actual partition locations if deviations from plans occurred. Prepare handover documentation for client including product specifications, fire rating certificates, acoustic testing requirements, and maintenance recommendations. Report completion and arrange inspection by relevant authorities if required for compliance certification.

Safety considerations

Conduct final inspection systematically using checklist to ensure no items are missed. Access tall partitions safely using appropriate equipment - do not overreach or use unsafe access methods for final checks. Document all safety-related issues encountered during installation and corrective actions taken. Ensure work area is completely clear of tools, materials, and debris before final handover. Verify all exclusion zone barriers can be removed safely with no residual overhead hazards. Update site safety documentation recording completion of partition work and any ongoing hazards in area.

Frequently asked questions

What are the structural requirements for fixing floor and ceiling tracks in commercial fit-outs?

Floor tracks must fix directly to structural concrete slabs or topping using appropriate fasteners at maximum 600mm centres and within 50mm of track ends and corners. Powder-actuated fasteners or masonry expansion anchors are typical fixing methods for concrete substrates. The substrate must be capable of developing required load resistance - installation over carpet or vinyl floor coverings is inadequate and these must be cut away at track locations. Ceiling tracks must fix to structural elements above including concrete slabs, steel roof decks, or timber framing. Where partitions terminate at suspended ceiling systems, additional support framing must extend from the partition head track to the structural ceiling above, typically using steel angles or channels at maximum 1200mm centres. Fire-rated partitions require ceiling tracks to fix to structure above suspended ceilings, not to ceiling grid alone, maintaining fire separation. In retail environments with raised access floors, partition loads must transfer to structural floor below through the access floor support system, requiring coordination with floor system supplier regarding load capacity and support requirements.

What safety precautions are required when using powder-actuated fastening tools in retail environments?

Powder-actuated tool operators must hold current competency certification specific to the tool type being used. Pre-use inspection checking barrel condition, trigger mechanism, and safety features must be documented before daily use. Only trained operators may load, operate, or maintain these tools. Establish physical exclusion zones with minimum 5-metre radius during fastening operations using barriers, not just signage, in public areas. Test-fire on sample substrate to verify appropriate charge strength - excessive charge causes complete punch-through while insufficient charge creates inadequate fixing. Scan substrates using cable detection equipment before firing into any floor or ceiling surface near known service routes. Wear safety glasses with side shields and hearing protection rated Class 4 or higher. Ensure tool is perpendicular to substrate with firm contact before discharge - angled firing increases ricochet risk substantially. Never attempt to drive fasteners into hard materials like steel beams, reinforcement bars, or extremely hard aggregate concrete which can shatter pins creating shrapnel. In operational shopping centres, coordinate fastening operations with centre management and conduct work during minimal public access periods where possible. Clear and inspect the work area after fastening operations before removing exclusion zones.

How should dust exposure be controlled during partitioning work in enclosed retail spaces?

Dust control requires multiple measures due to enclosed nature of retail fit-outs and proximity to operating businesses. Water suppression must be used for all concrete drilling operations using water-fed core drills that suppress silica dust at source. For plasterboard cutting, use vacuum-equipped cutting tools or hand-cutting methods (score and snap) rather than power saws generating airborne dust. Connect all power tools capable of dust generation to HEPA-filtered vacuum extractors rated for fine dust. Establish drop sheets and temporary barriers containing dust to the immediate work area preventing migration to adjacent tenancies. Use wet cleaning methods including wet mopping floors and wet wiping surfaces rather than dry sweeping which disperses settled dust back into air. Schedule high dust-generation activities during times when neighbouring retail tenants are closed, typically after hours. Where dust suppression alone cannot maintain exposures below workplace standards, provide P2 respirators to all workers in the affected area and ensure proper fitting and seal testing. Atmospheric monitoring may be required on larger projects to verify dust control effectiveness, particularly for crystalline silica exposure during concrete drilling. Coordinate with building management regarding any complaints from adjacent tenants about dust migration and increase control measures if issues arise.

What access equipment is appropriate for ceiling track installation at different partition heights?

For standard retail partitions with ceiling heights up to 3000mm, platform ladders with minimum 450mm x 450mm standing platform and handrail support provide safer access than conventional stepladders. The larger platform and handrail allow overhead work positioning while maintaining stability and three points of contact. For partition runs exceeding 6 metres in length, mobile scaffold platforms eliminate repeated ladder repositioning and associated fall risks from ladder movement. These platforms should have minimum 600mm width, lockable wheels preventing movement during work, and adequate deck space for staging materials. For ceiling heights exceeding 3500mm or where substantial ceiling track installation is required, manufactured mobile scaffold towers with multiple deck levels provide safer access and better work positioning than ladders. All access equipment must be rated to appropriate load capacity accounting for worker weight plus materials staged on platform - typical minimum 225kg rating. Equipment setup is critical - verify stable level base, all locking mechanisms engaged, and outriggers deployed if fitted. Work positioning should allow facing the work directly without twisting or overreaching beyond platform edges. For complex fit-outs with extensive ceiling work, consider installing working platforms using tube and fitting scaffolding spanning the entire work area, providing continuous safe access and eliminating repetitive access equipment repositioning.

What are the fire rating requirements for partitions in commercial fit-outs and how do they affect installation procedures?

Fire-rated partitions must achieve specified fire resistance levels (typically 60 minutes, 90 minutes, or 120 minutes) as detailed in Building Code of Australia and project specifications. Fire rating determines steel stud gauge, spacing, plasterboard type and number of layers, and installation detailing. Single-layer installations using fire-rated plasterboard may achieve 60-minute rating, while higher ratings require multiple plasterboard layers with staggered joints. Plasterboard joints on opposite partition faces must offset by minimum 600mm preventing continuous joint lines that compromise fire performance. Ceiling tracks must fix to structural ceiling above suspended ceiling systems, not to ceiling grid alone, maintaining fire separation between tenancies. All service penetrations through fire-rated partitions require fire-rated sealing using approved methods and products - gaps around electrical boxes, pipe penetrations, and cable bundles must seal with intumescent compounds or fire-rated batt insulation. Installation must follow tested system specifications exactly as variations can void fire rating certification. Door frames in fire-rated partitions require fire-rated frames and doors with appropriate sealing and hardware. Inspections by building surveyor or fire safety engineer typically occur at hold points before partition closure, verifying installation compliance before concealment. Documentation including product certificates, installation photos, and test reports must be maintained demonstrating fire rating compliance for building certification and future reference.

Related SWMS documents

Browse all documents

shop-fitting

Aluminium Window Door Frame Installation Safe Work Method Statement

Comprehensive SWMS for installing aluminium window and door frames including shopfronts, internal partitions, and commercial entrances with manual handling and glass safety controls.

View document

shop-fitting

Audio Visual Installation Safe Work Method Statement

Comprehensive SWMS for installing commercial AV systems including screen mounting, projector installation, speaker placement, and system commissioning with electrical and height safety controls.

View document

shop-fitting

Awnings Blinds Curtains Installation Safe Work Method Statement

Comprehensive SWMS for installing commercial awnings, blinds, and curtain systems including external awnings, motorised blinds, and heavy commercial curtains with work at heights and fixing safety controls.

View document

shop-fitting

Cabinet Installation Safe Work Method Statement

Comprehensive SWMS for installing retail display cabinets, storage units, reception desks, and commercial joinery in shop fitting projects including manual handling controls and coordination protocols.

View document

shop-fitting

Glass Whiteboard Installation Safe Work Method Statement

Comprehensive SWMS for installing glass whiteboards and writable glass surfaces in office fit-outs including glass handling procedures, wall fixing methods, and elevated work controls.

View document

shop-fitting

Glazing Safe Work Method Statement

Comprehensive SWMS for shopfront glazing and internal glass partition installation in shop fitting including glass handling, framing systems, and structural glass installation controls.

View document
Trusted by 1,500+ Australian construction teams

Partitioning Steel-Stud-Track SWMS Sample

Professional SWMS created in 5 seconds with OneClickSWMS

  • Instant PDF & shareable link
  • Auto-filled risk matrix
  • Editable Word download
  • State-specific compliance
  • Digital signature ready
  • Version history preserved
Manual creation2-3 hours
OneClickSWMS5 seconds
Save 99% of admin time and eliminate manual errors.

No credit card required • Instant access • Unlimited drafts included in every plan

PDF Sample

Risk Rating

BeforeHigh
After ControlsLow

Key Controls

  • • Pre-start briefing covering hazards
  • • PPE: hard hats, eye protection, gloves
  • • Emergency plan communicated to crew

Signature Ready

Capture digital signatures onsite and store revisions with automatic timestamps.

Continue exploring

Hand-picked SWMS resources

Ready to deliver professional SWMS in minutes?

OneClickSWMS powers thousands of compliant projects every week. Join them today.