What this SWMS covers
Garage door installation is a multi-stage process requiring precision and adherence to safety protocols. It begins with the careful assembly of the door's framework, including vertical and horizontal tracks, which must be perfectly aligned and securely fastened to the garage structure. The door panels are then fitted into these tracks. The most critical and hazardous part of the installation is managing the counterbalance system, which usually consists of one or two high-tension torsion springs. These springs are wound to a specific tension to perfectly balance the weight of the door, allowing it to be opened and closed easily. Finally, if automated, the electric opener is installed, the drive chain or belt is connected, and the system's safety features are programmed and tested.
Fully editable, audit-ready, and aligned to Australian WHS standards.
