Concrete foundation construction combines excavation, formwork installation, steel reinforcement placement, and concrete pouring operations creating the structural base supporting buildings and structures. Foundation types include strip footings supporting continuous load-bearing walls, pad footings supporting individual columns, raft slabs distributing building loads across entire site area, and pier footings transferring loads to competent bearing strata at depth. The work sequence begins with excavation creating trenches or pits to designed foundation depth and dimensions, followed by formwork installation defining foundation edges and containing wet concrete, steel reinforcement placement per engineering specifications, concrete delivery and placement filling formwork cavities, and finishing operations creating specified surface profiles. Foundation excavation depth typically ranges from 450mm minimum for residential strip footings to 2 metres or more for commercial pad footings reaching suitable bearing strata, with excavation width accommodating foundation dimensions plus working space for formwork installation and concrete placement typically 600-800mm wider than finished foundation. This work presents multiple serious hazards including trench collapse burying workers in excavated footings, falls into excavations causing traumatic injuries, contact with underground services during excavation creating electrocution and explosion risks, manual handling injuries from repetitive concrete placement and steel fixing work, cement chemical burns from concrete contact, and formwork failure during concrete placement causing uncontrolled concrete discharge. The combination of excavation work classified as high-risk construction work under WHS Regulation 2011 when excavations exceed 1.5 metres depth, with concrete placement operations involving heavy equipment and hazardous materials, creates complex risk environment requiring comprehensive Safe Work Method Statement documentation addressing all work phases from initial excavation through final concrete placement and curing.

Unlimited drafts • Built-in WHS compliance • Works across every Australian state

Overview

What this SWMS covers

Concrete foundation construction represents critical early-stage construction work establishing structural support for entire building or structure, requiring precise execution meeting engineering specifications for dimensions, reinforcement placement, concrete quality, and bearing surface preparation. The work is performed by builders, concreters, and excavation contractors with foundation design provided by structural engineers specifying footing dimensions, reinforcement details, concrete strength grades, and bearing surface requirements ensuring adequate load capacity and settlement performance. Foundation types selection depends on building loads, soil bearing capacity, site conditions, and structural system, with selection affecting excavation methods, formwork requirements, and concrete placement techniques. Strip footings comprise continuous concrete foundations typically 400-600mm wide and 300-600mm deep supporting load-bearing walls in residential and light commercial construction, excavated as continuous trenches along wall lines with formwork installed on trench sides defining footing width. Pad footings support individual columns transferring concentrated loads to bearing soil through square or rectangular concrete pads typically 1200-2400mm square and 500-1000mm deep, excavated as individual pits with formwork creating pad perimeter if required or poured directly into excavation if soil conditions permit neat excavation. Raft slabs provide continuous foundation under entire building footprint distributing loads across large area, suitable for poor bearing soils or where differential settlement must be minimized, constructed with edge beams excavated as perimeter trenches and slab area prepared with compacted fill. Pier footings transfer loads through unsuitable surface soils to competent bearing strata at depth using drilled shafts or driven piles terminating in concrete bell footings, requiring specialized excavation equipment and deep excavation safety measures. Excavation operations use various equipment depending on foundation type, site access, and soil conditions, including tracked excavators for bulk excavation, backhoes for trenching work, augers for pier drilling, and manual excavation for small quantities or restricted access. Excavation depth verification ensures foundations reach competent bearing material per engineering specifications, with test pits or dynamic cone penetrometer testing confirming soil bearing capacity meets design assumptions. Foundation base preparation includes removing loose material, achieving level or graded base per specifications, and compacting disturbed soil restoring bearing capacity reduced by excavation disturbance. Formwork installation follows excavation using timber boards, steel forms, or permanent formwork systems creating straight vertical edges, maintaining dimensional accuracy, and providing adequate strength containing hydrostatic pressure from wet concrete. Steel reinforcement placement per engineering bar schedules positions longitudinal bars, transverse bars, starter bars, and mesh reinforcement at specified locations and spacings, maintaining required concrete cover typically 75mm for footings in ground contact providing corrosion protection. Concrete placement operations coordinate concrete delivery, pumping or direct discharge into formwork, vibration ensuring consolidation without voids, and finishing to specified levels and surface profiles, with placement typically occurring continuously for each footing element preventing cold joints compromising structural integrity.

Fully editable, audit-ready, and aligned to Australian WHS standards.

Why this SWMS matters

Foundation excavation work is explicitly classified as high-risk construction work under WHS Regulation 2011 Section 291 when excavations exceed 1.5 metres depth or involve risk of person falling more than 1.5 metres, triggering mandatory SWMS requirements and specific excavation safety measures. Safe Work Australia data identifies excavation work as significant contributor to construction fatalities with trench and excavation collapses causing multiple deaths annually, often involving workers in narrow trenches where collapse provides no escape opportunity. Recent NSW prosecution involved $1.2 million combined fines following trench collapse fatality where worker was buried in unshored strip footing trench 2.2 metres deep, with investigation finding inadequate soil assessment, absence of shoring or battering, and workers entering excavation despite obvious collapse risk. Beyond collapse hazards, foundation excavation has resulted in fatalities from underground service strikes including gas line ruptures causing explosions, electrical cable contact causing electrocution, and workers falling into deep excavations from unstable edges or inadequate edge protection. The combination of excavation hazards with concrete placement risks including manual handling injuries, cement chemical burns, and equipment struck-by hazards creates exceptionally hazardous work environment requiring comprehensive risk management. Foundation concrete placement incidents have caused serious injuries from formwork failures discharging wet concrete onto workers, workers becoming trapped in wet concrete in deep footings, and concrete pump hose whip striking workers during placement. The confined nature of footing excavations restricts worker movement and escape routes if incidents occur, with workers in deep footings particularly vulnerable to burial from soil collapse or concrete discharge from formwork failure. Recent Victorian incident involved serious injuries when strip footing formwork failed during concrete placement causing wet concrete to discharge onto worker in adjacent trench, with investigation finding formwork bracing inadequate for concrete hydrostatic pressure and placement rate exceeded formwork design capacity. Insurance claims for foundation construction incidents involve expensive emergency rescue operations including excavation collapse rescues requiring specialized equipment, medical treatment costs for traumatic injuries and cement burns, and project delays from work stoppages following serious incidents. Principal contractors have duty to coordinate foundation work particularly when separate contractors perform excavation and concrete placement, ensuring excavation safety is maintained through concrete operations and systematic handover procedures verify safe working conditions before concrete activities commence. The regulatory focus on excavation safety and serious consequences of foundation construction incidents makes detailed SWMS documentation essential demonstrating systematic hazard management, with SWMS requirements extending to all foundation work regardless of depth when work is part of construction project.

Reinforce licensing, insurance, and regulator expectations for Concrete Foundations Excavating - Pouring Safe Work Method Statement crews before they mobilise.

Hazard identification

Surface the critical risks tied to this work scope and communicate them to every worker.

Risk register

Trench and Excavation Collapse Burying Workers in Foundation Excavations

high

Foundation excavations create vertical or near-vertical faces in soil that can collapse without warning burying workers in trenches or pits, with collapse mechanisms including soil cohesion loss from vibration or moisture changes, hydraulic pressure from groundwater, surcharge loads from excavated material stockpiled at excavation edges, and undercutting of excavation walls. Strip footing trenches create particularly hazardous confined spaces typically 400-600mm wide providing no escape opportunity if collapse occurs, with workers unable to move laterally to avoid collapsing soil. Soil type critically affects collapse risk with sandy soils and fill material lacking cohesion collapsing readily, while clay soils can stand vertical temporarily but fail catastrophically when moisture content changes or when vibration from equipment or concrete delivery trucks triggers collapse. Excavation depth directly correlates with collapse risk through increased soil weight above workers and greater potential energy in collapse, with excavations exceeding 1.5 metres depth requiring shoring, battering, or engineering assessment per WHS regulations. Groundwater ingress saturates soil reducing shear strength and creating hydraulic pressures forcing soil into excavation, with spring conditions or sites near waterways particularly susceptible to water-related instability. Workers must enter excavations to install formwork, place reinforcement steel, and perform concrete finishing operations, creating exposure to collapse hazard throughout foundation construction duration typically several days from excavation to concrete placement completion.

Consequence: Worker burial in collapsed excavation causing asphyxiation and crush injuries with high fatality rate, traumatic injuries including fractures and internal damage from impact of collapsing soil, permanent disability from spinal or head injuries if rescue is successful, complex emergency rescue operations requiring specialized equipment and creating risk to rescue personnel

Falls Into Foundation Excavations from Unstable Edges or Lack of Barriers

high

Foundation excavations create fall hazards from ground level into trenches and pits typically 0.5-2 metres deep, with falls onto excavation base, reinforcement steel, or formwork causing serious traumatic injuries. Excavation edges remain unstable for period after excavation as soil stress distribution adjusts, with edge collapse common within 1-2 metres of excavation particularly in loose or disturbed soil. Workers approach excavation edges to observe progress, pass materials to workers in excavations, or access excavation entry points, often without recognition of edge stability risk. Equipment and vehicles operating near excavations create vibration and surcharge loading triggering edge collapse, with particular risk when concrete delivery trucks position at excavation edges for concrete discharge. Night work or reduced visibility conditions increase fall risk as excavation edges are not clearly visible, requiring adequate lighting and edge delineation. Children accessing construction sites after hours have fallen into excavations with several fatalities occurring in residential construction sites with inadequate perimeter security and excavation barriers. The depth and configuration of foundation excavations typically precludes use of standard scaffolding or edge protection systems, requiring alternative fall prevention measures including barriers, covers, or warning systems.

Consequence: Traumatic injuries from falls onto excavation base including fractures, head injuries, and spinal damage, impalement injuries from falls onto exposed reinforcement steel projecting from footing bases, drowning if excavations contain water accumulation and worker is rendered unconscious by fall impact, liability for injuries to unauthorized persons including children if excavations are not adequately secured

Underground Service Strikes During Foundation Excavation Operations

high

Foundation excavations routinely encounter underground services including electrical cables, gas pipes, water mains, sewer lines, telecommunications cables, and stormwater pipes creating service strike risk during excavation. Electrical cable strikes with excavator buckets or hand tools energize equipment and create electrocution zones, with cable voltage ranging from 240V service cables to 11kV high-voltage distribution creating fatality risk. Gas pipe strikes release pressurized natural gas or LPG creating immediate fire and explosion risk particularly in confined excavation spaces where gas accumulates, with several construction fatalities from gas explosions following excavation strikes. Water main strikes release pressurized water flooding excavations and creating drowning risk if workers cannot exit quickly, destabilizing excavation walls through hydraulic erosion, and causing expensive emergency repairs and service interruption affecting multiple properties. Telecommunications cable strikes cause infrastructure damage with contractual liability for service interruption potentially exceeding $100,000 for major fiber optic trunk damage affecting multiple customers. Services are often deeper than indicated on plans, laterals and connections are frequently not shown on service authority plans, and service locations shown on plans are approximate only with actual position varying by 1-2 metres. Hydro-excavation or potholing verification of service positions before excavator work is essential but time-consuming and often skipped under schedule pressure.

Consequence: Worker electrocution from striking buried electrical cables with potential fatality, explosion and fire from gas line rupture causing traumatic injuries and potential fatalities, flooding and drowning risk from water main strikes, expensive service damage liability and emergency repair costs potentially exceeding $500,000, project delays from work stoppages pending service repairs

Manual Handling Injuries from Repetitive Foundation Construction Tasks

medium

Foundation construction involves extensive manual handling including lifting reinforcement steel bars weighing 6-20kg each with typical strip footing requiring 40-60 bars, positioning formwork boards weighing 15-30kg, moving wet concrete using shovels during placement typically several tonnes per footing, and using vibrators weighing 8-15kg for extended periods. Workers adopt awkward postures working in confined trench spaces, reaching to position reinforcement maintaining specified cover dimensions, bending during concrete placement and finishing operations, and lifting from below ground level passing materials from excavations. Repetitive nature of foundation work with multiple footings constructed sequentially creates cumulative loading over work shifts and weeks, with residential projects involving 30-50 strip footing sections and 20-40 pad footings representing substantial manual handling exposure. Wet concrete placement using shovels transferring concrete from delivery point to footing locations generates high back loading particularly when concrete must be placed in far corners of excavations, with concrete density 2.4 tonnes per cubic metre meaning shovel loads of 15-25kg are handled repeatedly. Foundation work occurs early in construction schedule often during winter months with cold conditions affecting muscle performance and increasing injury risk. Young workers and apprentices assigned extensive foundation work during early career years receive highest cumulative exposure creating risk of chronic musculoskeletal injuries affecting long-term work capacity.

Consequence: Chronic lower back pain and disc injuries from repetitive lifting and awkward postures, shoulder rotator cuff injuries from overhead work positioning reinforcement in formwork, acute muscle strains from lifting reinforcement and formwork in confined spaces, knee injuries from prolonged kneeling during concrete finishing work, permanent musculoskeletal damage reducing work capacity and quality of life

Cement Chemical Burns from Prolonged Concrete Contact During Placement

medium

Concrete placement operations create extensive skin contact with wet concrete having pH above 12 causing chemical burns through alkaline reaction with skin proteins. Foundation concrete placement involves workers standing in or kneeling in wet concrete during finishing operations, with concrete penetrating safety boots through lace holes and accumulating in boot interiors causing foot burns. Concrete splash during placement using concrete pump hoses or direct discharge from mixer trucks contacts skin on hands, arms, and face particularly when working in confined footing excavations where splash containment is difficult. Workers often underestimate cement burn risk because burns develop slowly over hours rather than immediately like thermal burns, with serious tissue damage occurring before discomfort prompts washing. Foundation work in summer heat encourages workers removing personal protective equipment including long sleeves and gloves for thermal comfort, increasing concrete contact exposure. Kneeling in wet concrete during finishing operations causes severe knee burns developing over 2-3 hours of exposure, with workers sometimes unaware of exposure until attempting to stand revealing extensive chemical burns. Lack of immediate washing facilities on foundation work sites located in vacant land areas delays concrete removal from skin allowing prolonged exposure and severe burns. Workers with existing cuts or abrasions experience accelerated burn development as concrete penetrates damaged skin more readily.

Consequence: Painful chemical burns causing skin damage, ulceration, and permanent scarring particularly on hands, knees, and feet, severe burns requiring skin grafts if concrete remains in contact for extended periods, cement dermatitis from repeated exposure causing permanently sensitized skin and potential career-ending condition, eye injuries from concrete splash causing corneal burns and vision impairment, infected burns from bacterial contamination of damaged skin requiring antibiotic treatment

Formwork Failure During Concrete Placement Causing Uncontrolled Discharge

medium

Foundation formwork systems contain hydrostatic pressure from wet concrete during placement with pressure increasing with concrete height, formwork failure causing sudden uncontrolled concrete discharge striking workers and flooding excavations. Strip footing formwork using timber boards supported by stakes can fail from inadequate bracing, stake withdrawal from soft soil, or board breakage under concrete pressure particularly when placement rate exceeds design assumptions. Pad footing formwork panels can overturn from inadequate anchorage or ground bearing failure beneath formwork supports, with tall pad footings generating substantial overturning moments. Concrete placement rate affects formwork loading with rapid placement not allowing time for concrete initial set before adding full height creating maximum hydrostatic pressure, while slow placement allows partial setting reducing pressure but extending worker exposure duration. Formwork joints between boards or panels can separate allowing concrete leakage creating void defects in finished footings and reducing formwork strength through progressive joint opening. Workers in adjacent trenches or at formwork perimeter are struck by discharging concrete if formwork fails, with wet concrete weight and fluidity creating burial risk similar to soil collapse. Formwork failure often occurs during initial concrete placement when early signs of distress including formwork movement or joint opening are not recognized or acted upon immediately.

Consequence: Workers struck by suddenly discharging wet concrete causing impact injuries and potential burial, concrete quality defects from formwork failure requiring expensive remedial work or footing replacement, project delays from formwork repairs and concrete removal following failures, trapped workers requiring emergency extraction from concrete discharge creating additional injury risk during rescue

Control measures

Deploy layered controls aligned to the hierarchy of hazard management.

Implementation guide

Engineered Excavation Design with Shoring, Battering, or Benching Systems

Engineering

Excavation stability engineering eliminates collapse risk through designed shoring systems, battered excavation walls, or benched excavations based on geotechnical assessment of soil properties and excavation geometry. Shoring systems using hydraulic shores, trench boxes, or engineered timber bracing provide physical support preventing excavation wall movement, with design considering soil type, excavation depth, surcharge loads, and water table position. Battered excavations with sloped walls at angles matching soil angle of repose eliminate collapse risk by creating stable slopes, though requiring wider excavation footprint and greater spoil removal volume. Benched excavations with stepped walls reduce wall height creating multiple shorter walls each below critical height for instability. The engineering control provides reliable protection based on fundamental geotechnical principles rather than subjective judgment, with designed systems specifying installation procedures, inspection requirements, and operational limitations ensuring effectiveness throughout excavation duration.

Implementation

1. Engage geotechnical engineer or qualified engineering geologist to assess site soil conditions before excavation commences, obtaining soil classification, shear strength parameters, and groundwater information 2. Develop excavation design based on geotechnical data specifying either shoring system requirements, batter angles for sloped excavations, or bench dimensions for stepped excavations 3. For excavations exceeding 1.5 metres depth in Type C soil (sand, gravel, disturbed ground), specify shoring systems or batter excavations to 1.5:1 (horizontal:vertical) slope minimum 4. For Type B soil (compacted fill, sandy clay), permit vertical excavations to 1.2 metres maximum or batter at 1:1 slope for deeper excavations 5. For Type A soil (undisturbed cohesive clay), permit vertical excavations to 1.5 metres or batter at 0.75:1 for deeper work, subject to no fissures or tension cracks observed 6. Install hydraulic shoring systems for trenches 1.5-3 metres deep in confined urban sites where battering is impractical, spacing shores maximum 2.4 metres apart per manufacturer specifications 7. Use trench boxes for deep narrow excavations providing mobile protection workers can install progressively as excavation advances, ensuring box extends minimum 600mm above excavation base 8. Conduct daily excavation inspection before workers enter checking for soil cracks indicating instability, water accumulation destabilizing walls, or surcharge loads at edges creating collapse risk 9. Prohibit workers entering excavations exceeding 1.5 metres depth without shoring, battering, or engineering certification confirming stability for vertical walls 10. Establish exclusion zones preventing equipment and stockpiled material within distance equal to excavation depth from excavation edges preventing surcharge-induced collapse 11. Monitor excavations during concrete placement operations as delivery truck loads and vibration can trigger collapse, evacuating workers during high-risk activities if excavation stability is marginal 12. Document excavation design including geotechnical report, shoring specifications, batter angles, installation procedures, and daily inspection records providing compliance evidence

Comprehensive Underground Service Detection and Potholing Verification

Elimination

Underground service detection eliminates service strike risk by locating all buried utilities before excavation commences, using service authority plans, electronic detection equipment, and physical potholing verification of service positions and depths. Service authority DBYD (Dial Before You Dig) plans provide initial service location information showing approximate positions of electrical, gas, water, telecommunications, and sewer services based on utility authority records, though positions are indicative only with accuracy typically +/- 2 metres. Electronic service detection using cable locators, pipe locators, and ground-penetrating radar physically scans excavation areas detecting metallic services and some non-metallic pipes, marking detected services on ground surface. Potholing using hydro-excavation, vacuum excavation, or careful manual excavation creates small pilot holes verifying service presence, depth, and lateral position before excavator operations commence, providing definitive confirmation of service locations. The elimination hierarchy control removes the hazard by verifying service absence in excavation paths or identifying exact service positions allowing excavation plans to avoid strikes through hand excavation near services or excavation path relocation.

Implementation

1. Lodge DBYD enquiry minimum 2 working days before excavation providing site location and proposed excavation extent, obtaining service authority plans showing indicated utility positions 2. Review DBYD plans identifying all services indicated within 10 metres of proposed excavation areas, noting service types, indicated depths, and protective zones 3. Mark proposed excavation boundaries on ground using white or pink spray paint or pegs clearly showing excavation extent 4. Conduct electronic service detection scanning entire excavation area using cable locator detecting electrical cables and steel pipes, and pipe locator identifying buried conduits 5. Mark detected services on ground surface using appropriate color coding: red for electrical, yellow for gas, blue for water, orange for telecommunications, purple for reclaimed water per AS 1345 6. Perform ground-penetrating radar scanning if available providing detection of non-metallic PVC pipes and verification of service depths 7. Conduct potholing at minimum 5 metre intervals along detected service paths using hydro-excavation or vacuum excavation exposing services to confirm presence, depth, and condition 8. Hand dig trial holes minimum every 10 metres along excavation path verifying service absence where electronic detection indicates no services, as services deeper than detection range may exist 9. Photograph exposed services documenting actual positions relative to surface markers, measuring and recording depths and lateral positions 10. Mark safe excavation zones and hand-dig zones on site based on verified service positions, establishing minimum 500mm clearance from all services for mechanical excavation 11. Implement hand excavation only within 500mm of verified electrical cables and gas pipes preventing damage from excavator buckets 12. Obtain service authority supervision for excavation within clearance zones of high-voltage electrical cables or high-pressure gas mains if required by utility 13. Brief excavator operators on verified service locations before excavation commences, providing marked plans and surface markers showing service positions and clearance requirements 14. Document service detection process including DBYD plans, electronic detection records, potholing results, service photographs, and excavator operator briefings in project safety file

Excavation Edge Protection Barriers and Warning Systems

Engineering

Physical barriers at excavation edges prevent personnel falls into foundation excavations and provide visual warning of excavation hazard locations to workers and equipment operators. Barrier types include temporary fence panels providing 1.8 metre high solid barrier preventing access, warning mesh or bunting on star pickets providing visual warning and physical deterrent, and covers over excavations closing openings when work is not active. The engineering control creates physical separation between workers and fall hazards rather than relying on awareness and caution alone, with properly designed barriers preventing falls even from inadvertent contact or stumbling. Edge barriers must be positioned adequately back from excavation edges accounting for unstable soil zone extending 1-2 metres from edge depending on soil type, preventing barrier collapse if edge fails bringing barrier into excavation.

Implementation

1. Install excavation edge barriers within 2 hours of excavation completion before workers commence formwork or steel fixing activities requiring excavation access 2. Position barriers minimum 1.2 metres back from excavation edges in stable soil, increasing to 2 metres in loose or sandy soil allowing for unstable edge zone 3. Use temporary fence panels with kickboards providing 1.8 metre height minimum and continuous barrier preventing accidental access, securing panels with weighted bases or ground pins 4. Install warning mesh or bunting between star pickets at 1.5 metre spacings as minimum barrier where fence panels are impractical, ensuring mesh is highly visible orange or red 5. Provide controlled access points with removable panel sections or gates at locations where workers must enter excavations, maintaining closure when access is not required 6. Install warning signage at barrier access points displaying 'DANGER - EXCAVATION - AUTHORIZED PERSONNEL ONLY - FALL RISK' with excavation depth and responsible person contact 7. Establish edge exclusion zones preventing equipment operation within 3 metres of excavation edges, marking exclusion boundaries with spray paint or bunting 8. Position concrete delivery trucks minimum 3 metres from excavation edges preventing edge collapse from vehicle weight and vibration, using concrete pumps for placement if truck approach is needed 9. Install adequate lighting at excavation edges for night work or reduced visibility conditions using elevated work lights or perimeter lighting illuminating edges and barriers 10. Cover small excavations using timber boards, steel plates, or proprietary covers when work is not active overnight or weekends, securing covers preventing removal or displacement 11. Install high-visibility delineators or flashing warning lights at excavation corners increasing visibility to equipment operators and reducing struck-by risk to barriers 12. Inspect barriers daily checking for damage, displacement, or gaps compromising effectiveness, repairing immediately and prohibiting work until barriers are restored 13. Maintain barriers throughout concrete curing period until excavations are backfilled removing fall risk, typically 3-7 days after concrete placement 14. Document barrier installation with photographs showing positioning, signage, and access controls, recording daily inspections and maintenance in site diary

Formwork Engineering Design and Installation Specifications

Engineering

Formwork design by competent persons ensures formwork systems have adequate strength containing concrete hydrostatic pressure during placement without failure or excessive deflection. Design considers concrete height and density creating pressure, placement rate affecting pressure development, vibration during consolidation creating dynamic loads, and environmental factors including temperature affecting concrete fluidity. Formwork specifications detail board dimensions, bracing spacing and anchorage, support stake penetration and spacing, connection methods, and maximum concrete placement rate maintaining pressure within design limits. The engineering control eliminates formwork failure risk through calculated design with appropriate safety factors, verified installation inspection, and operational controls during placement ensuring design assumptions are met.

Implementation

1. Engage competent person with formwork design experience to specify formwork systems for foundation applications, providing formwork drawings or specifications 2. Design strip footing formwork for concrete heights typically 300-600mm using 150x40mm or 200x40mm timber boards supported by 50x50mm stakes at 1.0-1.5 metre spacings 3. Specify stake penetration minimum 450mm into undisturbed soil providing adequate anchorage resisting overturning from concrete pressure, increasing penetration in soft soils 4. Detail bracing requirements including diagonal braces, tie wires, or clamps maintaining board vertical alignment and preventing bowing under concrete pressure 5. Design pad footing formwork for heights exceeding 600mm using plywood panels with timber or steel frames, calculating required brace spacing for concrete pressure 6. Specify maximum concrete placement rate typically 1-2 metres per hour for tall formwork allowing time for concrete initial set reducing hydrostatic pressure 7. Require formwork inspection before concrete placement verifying boards are straight and vertical, stakes are adequately penetrated, bracing is installed per specifications, and joints are tight 8. Establish hold points requiring supervisor sign-off on formwork installation before concrete delivery, documenting inspection on pour permit or checklist 9. Brief concrete placement crews on maximum placement rate and required placement sequence, prohibiting rapid continuous placement exceeding formwork design capacity 10. Monitor formwork during initial concrete placement watching for board movement, stake withdrawal, joint opening, or other distress signs requiring immediate placement cessation 11. Establish emergency stop procedures for formwork failure observations including immediate cessation of concrete discharge, worker evacuation from formwork vicinity, and structural assessment before proceeding 12. Document formwork design including drawings or specifications, installation inspection records, concrete placement rate monitoring, and any issues observed during use

Manual Handling Risk Assessment and Mechanical Handling Aids

Engineering/Administrative

Manual handling risk reduction combines mechanical aids eliminating or reducing lifting requirements, work procedures distributing tasks among multiple workers, and training in proper lifting techniques. Mechanical aids include excavators with lifting attachments positioning heavy reinforcement cages eliminating manual placement, concrete pumps delivering concrete directly to formwork eliminating shoveling, and trolleys or barrows transporting materials eliminating carrying. Administrative controls include two-person lifting protocols for reinforcement bundles exceeding 20kg, work rotation distributing heavy tasks among crew members, and task scheduling allowing adequate recovery between high-demand activities. The combined control approach reduces both acute injury risk from individual heavy lifts and cumulative injury risk from repetitive moderate-load handling.

Implementation

1. Assess manual handling requirements during foundation work planning identifying lifts exceeding 20kg, repetitive tasks involving sustained physical effort, and awkward postures in confined excavations 2. Provide excavators with lifting lugs or chain slings enabling positioning of assembled reinforcement cages directly into footings eliminating bar-by-bar manual placement 3. Use concrete pumps or concrete skips for placement delivering concrete directly to formwork eliminating or minimizing shoveling requirements 4. Provide wheelbarrows or concrete buggies for horizontal concrete transport where pump placement is impractical, using wide-wheel buggies for soft ground mobility 5. Pre-assemble reinforcement cages at ground level in ergonomic work positions, then mechanically lower into excavations rather than assembling in confined trench spaces 6. Establish two-person lift protocols requiring team lifting for formwork boards exceeding 15kg and reinforcement bundles exceeding 20kg, prohibiting solo lifting of heavy items 7. Implement work rotation during concrete placement distributing high-demand tasks including vibrator operation, shoveling, and finishing among multiple workers limiting individual exposure duration 8. Schedule adequate breaks during extended concrete pours implementing 10 minute break every 45-60 minutes continuous placement allowing muscle recovery 9. Train workers in correct lifting techniques including neutral spine posture, leg power rather than back lifting, avoiding twisting during lifts, and requesting assistance when uncertain 10. Modify excavation configurations providing adequate working space allowing workers to adopt better postures during formwork and steel fixing activities 11. Use long-handled shovels and vibrators reducing bending during concrete placement and consolidation operations in deep footings 12. Document manual handling assessments including identified high-risk tasks, control measures implemented, training provided, and incident monitoring for effectiveness review

Concrete Skin Protection Programme and Immediate Washing Facilities

Administrative/PPE

Concrete chemical burn prevention combines administrative procedures ensuring immediate washing capability, personal protective equipment providing barrier protection, and worker training covering burn risk recognition and response. Immediate washing facilities within 30 seconds travel time from concrete work areas enable prompt concrete removal from skin before chemical burns develop, using portable eyewash stations, water containers with taps, or connected hoses. Personal protective equipment including waterproof gloves, long-sleeved shirts, long trousers, and impermeable safety boots prevents concrete contact with skin. Training covers cement chemical burn mechanisms, slow burn development timeline, importance of immediate washing, and prohibition on kneeling in wet concrete. The combined programme approach provides multiple protective layers recognizing that PPE failures occur during sustained concrete work.

Implementation

1. Position portable water containers minimum 20 litres capacity with tap fittings within 30 seconds walking distance of all concrete placement areas providing immediate washing capability 2. Provide portable eyewash stations meeting AS 4775 requirements for emergency eye washing if concrete splash to eyes is possible during placement operations 3. Supply waterproof PVC or nitrile gloves providing cement chemical resistance to all workers involved in concrete placement, formwork, or finishing operations 4. Require long-sleeved shirts and long trousers for all concrete work preventing skin contact, prohibiting shorts or short-sleeved shirts regardless of weather conditions 5. Provide impermeable safety boots or rubber gumboots preventing concrete penetration through lace holes and seams, ensuring boots can be quickly removed if concrete entry occurs 6. Establish immediate washing protocol requiring workers to wash concrete from skin immediately upon contact not waiting until breaks or work completion 7. Train workers on cement chemical burn risk covering slow development over hours, alkaline pH above 12, and severe burns from prolonged exposure during toolbox meetings 8. Prohibit workers kneeling in wet concrete during finishing operations, providing knee boards or planks distributing weight preventing concrete contact with knees 9. Implement barrier cream application before work providing additional skin protection supplementing gloves and clothing, though creams do not replace PPE requirements 10. Establish daily PPE inspection with workers checking glove integrity before use and replacing damaged gloves immediately, monitoring boot condition for concrete penetration paths 11. Provide spare PPE including gloves and boots on site enabling immediate replacement if damage occurs during work preventing continued work with failed protection 12. Document skin protection training including chemical burn mechanisms, PPE requirements, immediate washing procedures, and reporting protocols for any skin irritation or burns

Personal protective equipment

Safety Helmets with Chin Straps

Requirement: Type 1 hard hats to AS/NZS 1801 with secure chin straps

When: Required at all times during foundation excavation and concrete placement operations protecting against struck-by hazards from excavated material, dropped tools or reinforcement, and overhead hazards from concrete placement equipment. Chin straps mandatory when working in excavations preventing helmet loss during bending or overhead work.

High-Visibility Clothing Class D

Requirement: AS/NZS 4602.1 Class D day/night high-visibility vests or shirts with reflective tape

When: Mandatory for all personnel in excavation areas ensuring visibility to excavator operators, concrete delivery drivers, and other workers preventing struck-by incidents. Particularly critical during early morning or late afternoon work with reduced natural light.

Steel-Capped Safety Boots with Waterproof Construction

Requirement: Lace-up or elastic-sided boots with steel toe caps, chemical-resistant waterproof materials, and deep-tread slip-resistant soles

When: Required continuously during excavation and concreting operations protecting against crush injuries from dropped materials, excavator buckets, and concrete equipment. Waterproof construction and chemical resistance essential preventing cement burns from concrete contact. Gumboots acceptable for concrete placement operations providing easy removal if concrete entry occurs.

Waterproof Chemical-Resistant Gloves

Requirement: PVC or nitrile-coated gloves providing cement chemical protection and waterproof barrier

When: Mandatory during all concrete handling activities including formwork installation involving concrete contact, steel fixing in wet conditions, and concrete placement and finishing. Must be replaced immediately if torn or perforated as damaged gloves provide no chemical protection. Not required during excavation work where cut-resistant gloves provide better protection from sharp rocks and reinforcement.

Safety Glasses with Side Shields

Requirement: AS/NZS 1337.1 impact-resistant clear glasses with side protection

When: Required during all excavation and concrete operations protecting against flying rocks during excavation, concrete splash during placement, and reinforcement steel contact during handling. Face shields recommended during concrete pump hose operations where high splash exposure occurs.

Hearing Protection Class 3-4

Requirement: AS/NZS 1270 Class 3-4 earplugs or earmuffs providing minimum 20 dB noise reduction

When: Required during excavator operation exceeding 85 dB(A), concrete vibrator use typically 95-105 dB(A), and when working near concrete delivery trucks and pumps. Must be worn continuously during noisy operations not just intermittently.

Cut-Resistant Gloves for Reinforcement Handling

Requirement: Cut-resistant gloves rated ANSI/ISEA Level A3-A4 minimum

When: Required during all reinforcement steel handling activities protecting against cuts from sharp bar ends, wire ties, and mesh edges. Not suitable for concrete placement where waterproof gloves required instead. Must fit snugly without excess material catching on reinforcement.

Long-Sleeved Shirts and Long Trousers

Requirement: Cotton or cotton-blend work clothing covering arms and legs

When: Mandatory during all concrete placement operations preventing cement chemical burns from concrete splash and contact. Clothing should be changed immediately if saturated with concrete to prevent prolonged skin exposure. Shorts and short-sleeved shirts prohibited during concrete work regardless of weather.

Inspections & checks

Before work starts

  • Verify geotechnical assessment completed providing soil classification and excavation design parameters for site conditions
  • Check DBYD service location enquiry completed minimum 2 days before excavation with service authority plans obtained and reviewed
  • Confirm potholing conducted at planned excavation locations verifying absence of underground services or marking service positions
  • Inspect excavation equipment including excavators, breakers, and hand tools ensuring serviceable condition with current safety compliance
  • Verify shoring equipment available if excavations will exceed 1.5 metres depth in unstable soil requiring engineered support
  • Check edge protection materials including barriers, warning mesh, stakes, and signage available for immediate installation after excavation
  • Confirm formwork materials delivered and inspected including boards, bracing, stakes, and fastenings matching design specifications
  • Verify reinforcement steel delivered matches bar schedules with correct sizes, grades, and quantities for foundation elements
  • Check concrete delivery scheduled with batch plant confirming mix specifications, delivery timing, and placement sequence
  • Confirm adequate washing facilities available including portable water containers or connected hoses for cement burn washing
  • Verify all workers inducted on foundation hazards including excavation collapse, service strikes, cement burns, and emergency procedures
  • Conduct pre-start toolbox meeting reviewing excavation plan, service locations, shoring requirements, concrete placement procedures, and emergency response

During work

  • Monitor excavation walls continuously during work checking for soil cracks, water seepage, or other instability indicators requiring immediate worker evacuation
  • Verify edge protection barriers remain in position and undamaged throughout excavation and concreting operations with daily inspection and maintenance
  • Ensure workers not entering excavations exceeding 1.5 metres depth without shoring installed or battered slopes meeting design specifications
  • Check excavation dimensions and bearing surface preparation meet engineering specifications before formwork installation authorization
  • Verify hand excavation procedures implemented within 500mm of verified service locations preventing mechanical excavation damage
  • Monitor formwork installation checking board alignment, stake penetration, bracing installation, and joint tightness before concrete placement approval
  • Confirm reinforcement placement matches engineering bar schedules with correct spacing, cover dimensions, and tie-wire fastening
  • Verify formwork inspection completed before concrete delivery with supervisor sign-off documented on pour permit or checklist
  • Monitor concrete placement rate ensuring compliance with formwork design limits typically 1-2 metres per hour for tall formwork
  • Observe formwork during concrete placement watching for board movement, stake withdrawal, or distress signs requiring immediate placement stop
  • Check workers wearing required PPE including waterproof gloves, long clothing, and boots during concrete placement operations
  • Ensure immediate washing facilities accessible throughout concrete work with portable water containers positioned within 30 seconds travel time
  • Verify workers taking scheduled breaks during extended concrete pours implementing work rotation for high-demand tasks
  • Monitor weather conditions particularly rainfall that could destabilize excavation walls or affect concrete quality requiring work suspension

After work

  • Inspect completed foundations checking concrete consolidation without voids, surface finish meets specifications, and dimensions within tolerance
  • Verify formwork bracing remains in place during curing period typically 3-7 days until concrete achieves adequate strength for formwork removal
  • Check excavation edge barriers maintained until backfilling completed removing fall hazards from open excavations
  • Confirm concrete curing procedures implemented including moisture retention through wet hessian, curing compounds, or plastic sheeting
  • Verify workers washed concrete from skin and PPE at completion of placement operations preventing delayed cement burns
  • Inspect excavation areas for any signs of wall instability or collapse risk requiring immediate barriers and stabilization before next work shift
  • Check equipment cleaned removing concrete residue from vibrators, shovels, and tools before hardening compromises equipment function
  • Document foundation completion including dimensions achieved, concrete quantity placed, reinforcement as-built positions, and any variations from design
  • Photograph completed foundations showing bearing surface preparation, reinforcement installation, and finished concrete for quality records
  • Verify excavation will remain secured overnight with barriers and covers in place preventing unauthorized access and fall risks
  • Conduct post-pour debrief with crew identifying any issues encountered, near-miss incidents, or improvements for subsequent foundation elements
  • Update project safety file documenting excavation design, service detection results, formwork inspections, concrete placement records, and incident reports

Step-by-step work procedure

Give supervisors and crews a clear, auditable sequence for the task.

Field ready
1

Underground Service Location and Excavation Planning

Begin foundation construction with comprehensive underground service detection minimum 2 working days before planned excavation date. Lodge Dial Before You Dig (DBYD) enquiry providing site address and proposed excavation extent accessing online portal or calling 1100 service, obtaining automated email response within hours containing service authority plans from all utility providers servicing the area. Review DBYD plans identifying all services indicated within 10 metres of proposed foundation excavations including electrical cables shown with voltage levels, gas pipes with pressure ratings, water mains with pipe sizes, telecommunications cables, and sewer lines with pipe dimensions and invert levels. Mark proposed excavation locations on site using white or pink spray paint or wooden pegs clearly showing foundation perimeter and extent, referencing building site plans and set-out survey marks establishing foundation positions. Engage qualified service detection contractor or use trained operators with electronic detection equipment to physically scan marked excavation areas, beginning with cable locator detecting electrical cables and steel pipes through electromagnetic field detection. Set cable locator to maximum sensitivity systematically scanning across excavation areas in perpendicular passes ensuring complete coverage, listening for signal peaks indicating service proximity and watching signal strength display. Mark detected services on ground surface using appropriate color-coded spray paint following AS 1345 standard: red for electrical, yellow for gas, blue for water, orange for telecommunications, and purple for reclaimed water, marking service path with dotted lines and indicating pipe/cable direction. Conduct potholing verification using hydro-excavation vacuum truck, manual excavation, or small excavator making pilot holes at 5-10 metre intervals along detected service paths, exposing services to verify presence, depth, and lateral position. Photograph exposed services documenting actual positions relative to surface marks, measuring depths to service tops and recording in site diary with reference to permanent site features enabling service position verification during excavation. Establish excavation clearance zones maintaining minimum 500mm horizontal distance from all services for mechanical excavation with hand-dig zones marked immediately adjacent to services. Brief excavator operator before work commences showing DBYD plans, marked service positions, and clearance requirements, confirming operator understanding of hand-dig zones and notification protocols if services are encountered.

Safety considerations

Service location provides high but not absolute certainty as services deeper than electronic detection range typically 75-100mm may not be detected, inactive electrical cables do not energize cable locators, and non-metallic PVC pipes are difficult to detect electronically. Maintain extreme vigilance during excavation with immediate stop-work if excavator bucket strikes unexpected resistance, colored warning tape appears, or unusual backfill material indicates service trench. For high-consequence services including high-voltage electrical cables exceeding 1000V and gas mains exceeding 210 kPa pressure, contact service authority requesting supervision during excavation if clearances cannot be maintained. Never rely on DBYD plans alone without physical verification as plan inaccuracies are common cause of service strikes with actual service positions varying up to 2 metres from indicated locations.

2

Foundation Excavation with Collapse Risk Management

Execute foundation excavation following systematic sequence ensuring continuous collapse risk assessment and control implementation. Position excavator at excavation starting location allowing optimal reach to foundation extent while maintaining minimum 3 metres clearance from excavation edges preventing surcharge loading on excavation walls. Commence excavation progressively removing soil in 300-500mm depth increments excavating full foundation length or pad area before deepening further, allowing visual inspection of soil profile and water table identification. Remove excavated spoil to designated stockpile locations minimum 2 metres from excavation edges measuring distance from estimated final excavation edge not current edge as distance reduces as excavation widens. Monitor soil conditions throughout excavation observing soil type transitions, moisture content variations, fissures or tension cracks indicating instability, and groundwater seepage requiring dewatering or support modification. For excavations approaching 1.5 metres depth in Type C soil (sand, gravel, disturbed ground), implement shoring installation or batter excavation walls to 1.5:1 slope minimum per WHS Regulation requirements. Install hydraulic shores progressively as excavation depth increases positioning first shore level at 1.0-1.2 metres depth, adding additional shore levels maximum 1.5 metres vertical spacing for deep excavations, with shores extending minimum 600mm above excavation base. Verify shore rail to soil contact is uniform along full length with no gaps allowing soil movement, adjusting shore extensions to achieve good bearing. Excavate to design foundation depth verifying depth with measuring tape or laser level referenced to site datum, checking multiple locations along strip footing length or across pad footing area ensuring consistent depth within tolerance typically +/- 25mm. Inspect bearing surface removing loose material, soft spots, or organic soil, exposing firm undisturbed soil or reaching specified bearing stratum per geotechnical recommendations. Conduct bearing surface assessment comparing actual soil conditions against geotechnical report predictions, notifying engineer immediately if different soil type encountered or water table higher than anticipated requiring design review. Install excavation edge protection barriers within 2 hours of excavation completion positioning temporary fence panels or warning mesh minimum 1.2-2.0 metres back from edges depending on soil stability.

Safety considerations

Excavation collapse risk is highest immediately after excavation and during first 24-48 hours as soil stress redistribution occurs creating instability invisible from surface observation. Prohibit workers entering excavations exceeding 1.5 metres depth without shoring, battering, or engineering certification regardless of apparent soil stability as cohesive clays can stand vertical temporarily then fail catastrophically. Monitor excavations continuously during work particularly after heavy rainfall, vibration from concrete delivery trucks, or extended time periods where soil drying or moisture changes affect stability. Evacuate workers immediately if any instability signs observed including soil cracks, slumping at edges, or unusual sounds indicating soil movement, prohibiting re-entry until engineering assessment confirms stability. Establish rescue equipment availability including rope, harness, and shield for worker extraction if collapse occurs, though primary control is preventing worker exposure to collapse risk through proper shoring and battering.

3

Formwork Installation and Reinforcement Placement

Install foundation formwork and reinforcement steel following engineering specifications and construction sequence ensuring dimensional accuracy and adequate concrete cover. Lower into excavation or position at excavation edges formwork boards cut to required lengths matching foundation dimensions, using 150x40mm or 200x40mm dressed timber for strip footings and plywood panels with frames for tall pad footings. Position formwork boards vertically along excavation edges maintaining design footing width typically 400-600mm for strip footings, using string lines and measuring tapes checking alignment and ensuring parallel board placement. Drive timber stakes 50x50mm minimum into firm undisturbed soil adjacent to formwork boards at 1.0-1.5 metre spacings, penetrating minimum 450mm depth providing adequate anchorage resisting concrete pressure during placement. Nail or screw formwork boards to stakes using galvanized fasteners minimum 75mm length creating secure connection, checking board vertical alignment with spirit level and adjusting stake positions as needed. Install diagonal bracing connecting formwork to stakes or ground anchors preventing board bowing under concrete pressure, using timber braces nailed at 45 degree angles or wire ties securing formwork. Verify formwork dimensions checking width, depth, and length against foundation design drawings, measuring multiple locations and adjusting as needed achieving tolerance typically +/- 10mm on width and length. Inspect formwork joints between boards checking for gaps exceeding 5mm requiring filler strips or caulking preventing concrete leakage, and verify formwork base seals against excavation floor preventing concrete escape beneath boards. Install reinforcement steel per engineering bar schedules beginning with bottom longitudinal bars supported on plastic chairs or concrete blocks providing specified cover typically 75mm beneath bottom bars. Position transverse bars crossing longitudinal bars at specified spacing tying intersections with wire ties creating stable cage maintaining position during concrete placement. Install vertical starter bars projecting above foundation top for wall or column connections where required, checking bar projections match design heights and positions. Verify reinforcement cover dimensions using cover meters or spacers ensuring minimum 75mm clear distance between steel and formwork surfaces on all sides, adjusting bar positions as needed meeting specifications. Conduct reinforcement inspection checking bar sizes match schedule callouts typically N12, N16, or N20, bar spacing matches design typically 200-400mm centers, laps meet minimum length requirements typically 40 bar diameters, and wire ties are tight preventing bar movement. Photograph completed formwork and reinforcement before concrete placement providing installation records and facilitating engineering approval or third-party inspection if required.

Safety considerations

Workers installing formwork and reinforcement in excavations exceeding 1.5 metres depth must have shoring protection or battered slopes preventing collapse burial risk. Use mechanical lifting for reinforcement cages exceeding 20kg rather than manual placement preventing back injuries, with excavator equipped with chain slings or lifting lugs lowering cages into position. Wear cut-resistant gloves during all reinforcement handling protecting against lacerations from sharp bar ends and mesh edges, though remove gloves before concrete placement where waterproof gloves required. Ensure adequate working space in excavations allowing good postures during formwork and steel installation, typically requiring excavation width 600-800mm greater than finished foundation width. Brief concrete placement crews on formwork design including maximum placement rate typically 1-2 metres per hour and required placement sequence, establishing protocols for immediate placement stop if formwork movement or distress observed.

4

Concrete Placement and Finishing Operations

Execute concrete placement following controlled procedures ensuring formwork integrity, concrete consolidation, and protection from cement chemical burns. Conduct final formwork inspection before concrete delivery verifying boards are straight and vertical, stakes are adequately penetrated providing firm support, bracing is installed per design, joints are tight preventing leakage, and reinforcement is secured at correct positions. Sign-off formwork approval on pour permit or checklist documenting supervisor verification, prohibiting concrete delivery until approval obtained. Position concrete delivery truck or pump discharge point optimizing access to formwork while maintaining minimum 3 metres clearance from excavation edges, using concrete pumps with hoses if truck approach closer than 3 metres is required. Don personal protective equipment before concrete arrival including waterproof gloves, long-sleeved shirt, long trousers, waterproof safety boots or gumboots, and safety glasses with face shield if splash exposure is high. Position portable washing facilities within 30 seconds travel time of concrete work area ensuring immediate washing capability for any concrete skin contact. Commence concrete placement at one end of strip footing or one corner of pad footing progressing systematically toward opposite end, maintaining controlled placement rate not exceeding formwork design capacity typically 1-2 metres per hour for tall formwork. Distribute concrete evenly along footing length or across pad area using shovels or rakes preventing concentrated loads that could cause formwork failure, filling formwork in layers 300-500mm deep rather than pouring full height in one area. Consolidate concrete using mechanical vibrators immediately after placement inserting vibrator vertically into concrete at 500mm spacings holding 5-15 seconds until air bubbles cease and surface becomes glossy indicating consolidation, avoiding over-vibration causing segregation. Monitor formwork throughout placement watching for board movement, stake withdrawal, joint opening, or other distress signs, stopping placement immediately if any movement observed and allowing concrete initial set before resuming. Strike-off excess concrete to formwork top using screeding board or straight-edge achieving design height, filling low spots and removing high spots creating uniform top surface. Apply surface finish as specified using steel trowel for smooth finish or broom for rough anti-slip texture, working concrete while plastic typically within 1-2 hours of placement depending on ambient temperature. Implement curing procedures immediately after finishing covering concrete with wet hessian, plastic sheeting, or applying curing compound preventing moisture loss during critical early strength development. Clean all concrete contact from skin immediately after placement completion using water from portable washing facilities, particular attention to hands, forearms, and any areas where concrete penetrated clothing. Remove concrete-contaminated PPE including gloves and boots washing thoroughly before storage, replacing damaged items providing no continued protection.

Safety considerations

Concrete chemical burns develop slowly over 2-3 hours contact time making immediate washing critical rather than waiting until work completion when serious burns may have already occurred. Never kneel in wet concrete during finishing operations as prolonged knee contact causes severe burns, using knee boards or planks if kneeling positions are unavoidable for access. Monitor formwork continuously during placement as failures typically occur during initial concrete placement when hydrostatic pressure is highest before any initial set strength develops. Evacuate workers from formwork vicinity immediately if any formwork movement observed, prohibiting re-entry until structural assessment confirms stability or formwork repairs completed. Ensure adequate ventilation if concrete contains chemical admixtures that may emit fumes, working in open air when possible rather than confined excavations. Take scheduled breaks during extended pours implementing 10 minute rest every 45-60 minutes continuous placement allowing muscle recovery from sustained physical work and heat stress prevention during warm conditions.

Frequently asked questions

When is shoring required for foundation excavations in Australia?

Shoring or equivalent protection is mandatorily required under WHS Regulation 2011 when excavations exceed 1.5 metres depth in soil that could collapse, classified as Type C soil including sand, gravel, disturbed ground, or any soil showing signs of instability including fissures, tension cracks, or previous movement. For Type B soil being compacted fill or sandy clay, vertical excavations are permitted to 1.2 metres maximum depth without shoring, requiring shoring, battering, or benching for deeper work. Type A soil being undisturbed cohesive clay with no fissures may be excavated vertically to 1.5 metres depth subject to competent person assessment confirming stability, with shoring required for greater depths or if any instability indicators present. The fundamental principle is that no worker enters excavations exceeding 1.5 metres depth without protective systems including shoring providing physical support, battered slopes at angles matching soil stability typically 1.5:1 or flatter, benched excavations with stepped walls reducing effective wall height, or engineering certification by geotechnical engineer confirming vertical walls are stable for actual site soil conditions. Shoring systems include hydraulic shores adjustable for different trench widths and expandable to various wall heights, trench boxes providing mobile protection progressively advanced as excavation proceeds, or engineered timber or aluminum shoring with designed bracing. Even for shallow excavations under 1.5 metres, shoring may be required if soil conditions indicate collapse risk including saturated soils, loose fill material, proximity to existing excavations, or surcharge loads from equipment and stockpiles at excavation edges. The consequences of inadequate shoring include worker burial in trench collapse with high fatality rate, expensive emergency rescue operations, criminal prosecution and fines exceeding $1 million following collapse fatalities, and project delays from work stoppages. Site supervisors must be competent to assess excavation stability or engage geotechnical engineers providing professional assessment, never relying on subjective judgment that soil 'looks stable' as most fatal collapses occurred in excavations that appeared stable before sudden failure.

How do I verify foundation excavations have reached suitable bearing material?

Foundation bearing surface verification ensures excavations reach competent soil or rock capable of supporting building loads without excessive settlement, following systematic procedures combining visual assessment, comparison to geotechnical investigation predictions, and physical testing if needed. Begin with visual inspection of excavated bearing surface observing soil type, color, moisture content, and consistency comparing against geotechnical report describing expected bearing stratum characteristics at design foundation depth. Undisturbed competent bearing soils typically exhibit consistent color and texture, firm consistency resisting penetration by thumb or finger pressure, no soft spots or organic material, and absence of water seepage or saturation indicating water table. Remove all loose material, construction debris, softened soil from weather exposure, and organic topsoil from bearing surface exposing firm natural soil, using hand tools for final cleaning rather than excavator buckets that disturb bearing surface. Measure excavation depth at multiple locations along strip footings or across pad footings verifying depth matches design specifications typically specified on structural drawings, accounting for variations in natural ground level affecting required excavation depths. Compare exposed soil against geotechnical investigation bore log predictions for soil type, color, strength, and transition depths, with substantial variations requiring engineer notification before foundation construction proceeds. Conduct simple bearing tests including attempting to indent soil surface with thumb (should not indent more than 5-10mm for adequate bearing capacity), dropping 5kg weight from waist height observing penetration depth (should not penetrate more than 25mm), or using dynamic cone penetrometer measuring penetration resistance if quantitative verification needed. For projects with geotechnical investigation, verify bearing surface consistency with bore log soil descriptions at similar depths, noting that natural soil variations mean exact match is not expected but general characteristics should align. If bearing surface differs significantly from geotechnical predictions including encountering fill material deeper than indicated, different soil type from predicted, water table higher than expected, or soft zones and voids, notify structural engineer immediately before foundation construction proceeds. Engineer may require additional investigation through test pits extending below foundation level, laboratory testing of exposed bearing soil, or foundation design modifications including deeper excavation to better material or increased foundation width distributing loads across larger bearing area. Document bearing surface verification with photographs showing soil appearance and excavated depth, written description of soil characteristics, depth measurements, and professional verification by engineer or qualified geotechnical consultant providing certification that bearing surface is acceptable. The verification process prevents foundation failures from inadequate bearing capacity that would cause building settlement, cracking, or structural distress developing months or years after construction completion.

What is maximum concrete placement rate for timber formwork to prevent failure?

Maximum concrete placement rate for timber formwork depends on formwork design, bracing specifications, concrete temperature and fluidity, and formwork height, with typical limits ranging from 1-2 metres per hour vertical rise for standard strip and pad footing applications using timber boards and stakes. The placement rate limit exists because concrete generates hydrostatic pressure like liquid acting against formwork, with pressure magnitude depending on concrete height, placement rate, and time for concrete to develop initial set reducing fluidity. Rapid placement pouring full formwork height in 15-30 minutes creates maximum theoretical hydrostatic pressure calculated as concrete unit weight (typically 24 kN/m³) multiplied by height, potentially exceeding 15 kN/m² for 600mm high formwork. Slower placement allowing time for concrete initial set before adding full height reduces actual pressure as lower concrete layers partially set providing self-support, with placement rates 1-2 metres per hour typically limiting actual pressure to 60-80% of theoretical maximum. Formwork design specifications should state maximum placement rate and maximum concrete height for particular formwork configuration, bracing spacing, and stake penetration used on project, though many residential foundation jobs lack formal formwork design relying on conventional construction practice. Conventional timber formwork for residential strip footings using 150x40mm or 200x40mm boards with 50x50mm stakes at 1.0-1.5 metre spacings can generally accommodate placement rates up to 2 metres per hour for footing heights 300-400mm, reducing to 1 metre per hour for 500-600mm heights providing adequate safety margin. For tall pad footing formwork exceeding 600mm height using plywood panels with timber frames, placement rates should not exceed 1 metre per hour and concrete should be placed in lifts with consolidation and partial set time between lifts reducing pressure on formwork. Temperature affects placement rate limits as hot weather increases concrete fluidity maintaining higher hydrostatic pressure for longer period, while cold weather accelerates initial set reducing pressure more quickly allowing slightly faster placement. Concrete with retarders extending working time or superplasticizers increasing fluidity generates higher pressures requiring slower placement rates or increased formwork strength. Monitor formwork throughout placement watching for warning signs including boards bowing outward, stakes leaning or withdrawing from soil, joints opening between boards, or bracing loosening indicating formwork is experiencing excessive pressure approaching failure. If any formwork movement observed, immediately stop concrete placement allowing time for initial set to develop before resuming, and do not attempt to force remaining concrete into distressed formwork risking catastrophic failure. Brief concrete delivery drivers and placement crews on required placement rate before concrete arrives, establishing communication that enables placement speed control matching formwork capacity rather than uncontrolled rapid discharge overwhelming formwork. The consequences of exceeding formwork capacity include formwork failure discharging wet concrete striking workers causing serious injuries, concrete quality defects requiring expensive remediation, and project delays from formwork repairs.

How long should concrete cure before formwork removal from foundation footings?

Foundation formwork removal timing depends on concrete strength development, ambient temperature during curing, concrete mix design, structural loading, and required early strength, with minimum curing periods ranging from 3 days for warm weather summer construction to 7+ days for cool weather or early loading situations. Australian Standard AS 3600 Concrete Structures specifies minimum curing periods before formwork removal as 3 days for vertical formwork (footing sides) when ambient temperature exceeds 20°C enabling rapid early strength development, increasing to 5-7 days when temperature is 10-15°C slowing curing rate. The curing requirement ensures concrete achieves adequate strength supporting self-weight without cracking or deformation when formwork support is removed, with minimum strength typically 5-10 MPa required for formwork removal while design strength 20-40 MPa is achieved at 28 days. Hot weather conditions above 25°C accelerate curing enabling formwork removal after 2-3 days for strip and pad footings that are not heavily loaded, though maintaining moisture during curing prevents surface cracking from rapid drying. Cold weather below 10°C substantially slows curing potentially requiring 7-10 days before formwork removal, with temperatures below 5°C requiring heated enclosures or insulated blankets maintaining concrete temperature above freezing threshold. High early strength concrete mixes using rapid hardening cement, reduced water content, or chemical accelerators can achieve adequate strength for formwork removal in 24-48 hours, though engineer approval required before early formwork removal using non-standard mixes. Construction loading on footings before design strength is achieved requires extended formwork retention period or temporary shoring supporting loads until concrete reaches required strength, with backfilling excavations against footings creating lateral loads requiring minimum 7 days curing before backfill placement. Simple verification of adequate strength for formwork removal involves testing concrete hardness by attempting to scratch surface with hard object (should not scratch easily if strength is adequate), though not scientifically rigorous provides qualitative indication. For critical foundations or situations requiring verified strength before formwork removal, field-cured concrete test cylinders cast during placement can be tested at planned formwork removal time confirming strength, or non-destructive rebound hammer testing of in-place concrete provides strength estimation. General good practice for standard residential strip and pad footings is maintaining formwork minimum 3 days in warm weather (above 20°C), 5 days in moderate weather (15-20°C), and 7 days in cool weather (10-15°C), with bracing and stakes left in place throughout curing period even if formwork boards could be removed earlier. The conservative approach prevents formwork removal before adequate strength development risking concrete damage, cracking, or deformation affecting long-term durability and structural performance. After formwork removal, continue moist curing using wet hessian, water ponding, or curing compounds maintaining moisture through 7 days minimum and preferably 14-28 days for optimal strength development and durability, recognizing early formwork removal does not complete curing requirements.

Related SWMS documents

Browse all documents
Trusted by 1,500+ Australian construction teams

Concrete Foundations Excavating - Pouring SWMS Sample

Professional SWMS created in 5 seconds

  • Instant PDF & shareable link
  • Auto-filled risk matrix
  • Editable Word download
  • State-specific compliance
  • Digital signature ready
  • Version history preserved
Manual creation2-3 hours
OneClickSWMS5 seconds
Save 99% of admin time and eliminate manual errors.

No credit card required • Instant access • Unlimited drafts included in every plan

PDF Sample

Risk Rating

BeforeHigh
After ControlsLow

Key Controls

  • • Pre-start briefing covering hazards
  • • PPE: hard hats, eye protection, gloves
  • • Emergency plan communicated to crew

Signature Ready

Capture digital signatures onsite and store revisions with automatic timestamps.

Continue exploring

Hand-picked SWMS resources

Ready to deliver professional SWMS in minutes?

OneClickSWMS powers thousands of compliant projects every week. Join them today.